A selection of completed projects of the last years is shown in the following table.
| Name | Time Frame | Contact Person |
| Kopernikus – ENavi | 10.2016 to 09.2019 | Dipl.-Ing. Christian Heinze |
| COORETEC – MONIKA | 12.2017 to 05.2019 | M.Sc. Martin Haaf |
| COORETEC – LISA II | 12.2013 to 11.2017 | Dr.-Ing. Jochen Ströhle |
| EU-FP7 – SCARLET | 04.2014 to 03.2017 | Dr.-Ing. Jochen Ströhle |
| EU-FP7 – SUCCESS | 09.2013 to 02.2017 | Dr.-Ing. Jochen Ströhle |
| COORETEC – WOK | 10.2013 to 09.2016 | Dr.-Ing. Jochen Ströhle |
| IGF – Korrosion | 11.2012 to 06.2015 | Dr.-Ing. Jochen Ströhle |
| EU-RFCS – ACCLAIM | 07.2012 to 12.2014 | Dr.-Ing. Jochen Ströhle |
| EU-RFCS – CARINA | 07.2010 to 09.2013 | Dr.-Ing. Jochen Ströhle |
| BMU – Torrefaction | 09.2010 to 08.2013 | Dr.-Ing. Jochen Ströhle |
| IGF – Carbonate Looping | 06.2010 to 05.2013 | Dr.-Ing. Jochen Ströhle |
| COORETEC – LISA | 09.2008 to 02.2013 | Dr.-Ing. Jochen Ströhle |
| EU-RFCS – ECLAIR | 07.2008 to 12.2012 | Dr.-Ing. Jochen Ströhle |